Complied all IS Code as required in respect of Raw Material such as IS 458:1988, IS 458:2000, IS 458:2003, IS 383:1970,IS 456:2000, IS 3597:1998, IS 10262:1982, SP-23, IS 343,432,516,783. The specimens of the Concrete pipes are subject to the following tests as per I.S. 3597:1998(second revision incorporating amendment No.1 of March 2003)
- Three Edge Bearing Test
- Absorption Test
- Hydrostatic Pressure Test
- Permeability Test
- Straightness Test
The Precast concrete pipes with reinforcement shall be made as per Indian Standard Specification formulated by The Bureau of Indian Standards (BIS:458-2003) (fourth revision) for maintaining quality of the product to confirm to prescribed pressure rating as follows :
- Working Pressure
- Site Test Pressure
- Hydrostatic Pressure
- Surge ( Water Hammer) Pressure
- Pipes are also manufactured to other international standards to suit a wide range of client's requirements.
|