Design of 5 bridges for Government of Tamil Nadu
 

• Project Description : RCC T-beam/box type superstructure with pile foundation

 

• Project Start Date : 1996

 

• Project End Date : 2000

 

• Project Value : Rs. 100 Crore

 

• Client : Madhava Hytech Engineers Ltd

 
Projects Photo
 
Design of Bridge across river Gowthami Godavari on R/F Yanam to Yedurlanka (1.8 kms long) in the State of Andhra Pradesh
 

• Project Description : 1800 m (45x40), PSC with box type girder, superstructure with pile foundation of 30m to 50m deep

 

• Project Start Date : 1999

 

• Project End Date : 2000

 

• Project Value : Rs. 60 Crore

 

• Client : Navayuga Engineering Company Ltd

 
 
 
Projects Photo
 
Detail Engineering & Value Engineering for 4 - laning of Tambaram - Tindivanam section from Km.28.000 to Km.122.000 section of NH-45 in the state of Tamil Nadu (structures only)
 

• Project Description : 1800 m (45x40), PSC with box type girder, super structure with pile foundation of 30m to 50m deep

 

• Project Start Date : 2002

 

• Project End Date : 2003

 

• Project Value : Rs. 350 Crore

 

• Client : Madhucon-UEDIPL JV

 
Projects Photo
 
Feasibility and Detailed Project Report for 4-laning of Thrissur-Angamali (from Km.270.000 to Km.316.700) section of NH-47 in the State of Kerala
 

• Project Description : Total length of Project : 46 Kms Major Bridges : 3 nos, Minor Bridges : 3 nos. Flyovers : 6 nos.

 

• Project Start Date : June , 2003

 

• Project End Date : June, 2004

 

• Project Value : Rs. 236 Crore

 

• Client : National Highway Authority of India, New Delhi.

 
 
 
Projects Photo
 
Detail & Value Engineering for 4-laning of Bharatpur-Mahua section from Km.63.000 to Km.120.000 in the state of Rajasthan
 

• Project Description : Total length of Project : 57 Kms Major Bridges : 1 no Minor Bridges : 4 nos. Flyovers : 1 no Underpass : 5 ROB : 1

 

• Project Start Date : April , 2006

 

• Project End Date : December, 2009

 

• Project Value : Rs. 450 Crore

 

• Client : Madhucon Agra-Jaipur Expressways Ltd.

 
Projects Photo
 
Detail & Value Engineering for 6-laning of Panipat-Jalandhar section of NH-1 from Km.96.000 to Km.196.000 in the state of Haryana/Punjab
 

• Project Description : Total length of Project : 100 Kms Major Bridges : 2 nos Minor Bridges : 44 nos. Flyovers : 26 no VUPs : 14 PUPs : 21

 

• Project Start Date : June , 2008

 

• Project End Date : December, 2010

 

• Project Value : Rs. 1050 Crore

 

• Client : Soma - Isolux JV.

 
 
 
Projects Photo
 
Detail & Value Engineering for 4-laning of Lakhnadon-Seoni section from Km.547.400 to Km.596.750 in the state of M P
 

• Project Description : Total length of Project : 49 Kms Major Bridges : 2 No Minor Bridges : 17 No. Underpass : 8 No

 

• Project Start Date : July , 2006

 

• Project End Date : December, 2008

 

• Project Value : Rs. 313 Crore

 

• Client : Malaxmi Highway Pvt. Ltd.

 
Projects Photo
 
Detail & Detail & Value Engineering for 4-laning of Trichy-Thanjavur section of NH-67 from Km.80.000 to Km.137.750 in the state of Tamil Nadu
 

• Project Description : Total length of Project : 57.75 Kms Major Bridges : 2 No , Minor Bridges : 17 Nos. Flyovers : 9 Nos VUPs : 3 Nos

 

• Project Start Date : July , 2006

 

• Project End Date : December, 2011

 

• Project Value : Rs. 450 Crore

 

• Client : Trichy-Tanjavur Expressways Ltd.

 
 
 
Projects Photo
 
Detail & Value Engineering for 4/6 laning of Gujarat/MH border - Surat - Hazira Port section (NH-6) from Km. 0.000 to Km. 76.000 in the state of Gujarat
 

• Project Description : Total length of Project : 76 Kms Major Bridges : 2 No Minor Bridges : 20 Nos. Flyovers : 7 Nos ROB : 3 Nos

 

• Project Start Date : April , 2009

 

• Project End Date : December, 2012

 

• Project Value : Rs. 600 Crore

 

• Client : Soma-Isolux JV

 
Projects Photo
 
Detail & Value Engineering for 4-laning of Ranchi-Rargaon-Jamshedpur section of NH-33 from Km.113+730 to Km.277+500 in the State of Jharkhand
 

• Project Description : Total length of Project : 163.770 Kms Major Bridges : 5 No Minor Bridges : 45 Nos. Flyovers : 7 Nos ROB : 3 Nos VUPs : 13 Nos PUPs : 3 No

 

• Project Start Date : May , 2011

 

• Project End Date : November, 2015

 

• Project Value : Rs 1655 Crore

 

• Client : Ranchi Expressways Ltd.

 
 
 
Projects Photo
 
Detail & Value Engineering for 4-laning of Barasat - Krishnagar section of NH-34 from Km.31.000 to Km.115.000 in the State of West Bengal
 

• Project Description : Total length of Project : 84 Kms Major Bridges Minor Bridges : 6 Nos. Flyovers : 2 Nos ROB : 4 Nos RUB :1

 

• Project Start Date : March , 2011

 

• Project End Date : December, 2013

 

• Project Value : Rs 980 Crore

 

• Client : Barasat-Krishnagar Expressways Ltd.

 
 
 
 
 
 
 

LIST OF PROJECTS (COMPLETED / ONGOING)

 
 

On-going Projects (DPR /Value Engineering of Highway Projects)

 

S.No.

Project  Title

Client

Status

1.

Preparation of Detailed Project Report for upgradation to 2-lane with paved shoulders of existing road and construction of new road in missing links from Eturunagaram to Mahadevpur (via) Kothuru, Singur, Thupakulagudem, Suraram along river Godavari in the State of Telangana (length 100 kms)

R & B Dept., Govt. of Telangana on-going
       

2.

Preparation of Detailed Project Report for upgradation to 2-lane with paved shoulders of existing road and construction of new road in missing links from Kaleswaram to Sirpur (via) Vemanpally, Bejjur & Kouthala along river Pranahitha in the State of Telangana (length 130 kms)

R & B Dept., Govt. of Telangana on-going
       

3.

Preparation of Detailed Project Report for widening from existing single/intermediate lane to double  lane for the roads in Mahaboobnagar Dist.,(approx. 580 kms)

R & B Dept., Govt. of Telangana on-going
       

4.

Preparation of Detailed Project Report for single lane to double lane road of Alampur to Kyathur road via Gondhimall Village ffrom Km. 0/0 to Km.15/4 in Mahabubnagar dist,

R & B Dept., Govt. of Telangana on-going
       

5.

Preparation of Detailed Project Report improvements of double lane to four lane of Yerrigera – Leeja – Alampur Road from Km.69/0 to 83/6 in Mahabubnagar dist

R & B Dept., Govt. of Telangana on-going
       

6.

2-laning with paved shoulders from Km.1.600 to Km.80.000 (existing chainage) of Nagapattinam - Thanjavur section of NH-67 in Tamil Nadu

Madhucon Projects Ltd., on-going
       

7.

4-Laning of Ranchi-Rargoan-Jamshedpur, Section of NH- 33, from KM113+730 to Km277+500 in Jarkhand

Ranchi Expressways Ltd., on-going
       

8.

4-laning of Chappra – Hazipur section from Km 143+200 to Km.209+940 (Design chainage) of NH - 19 in Bihar.

Chhapra-Hajipur Expressways Ltd., on-going
 
 
 

Completed Projects (Value Engineering of Highway Projects) (As Concessionaire / EPC Enginee)

 

S.No.

Project  Title

Client

Status

1.

4-laning of  Rajauli to Bakhtiyarpur section of  NH-31 from Km. 47.677 to Km.154.500 in Bihar.

Rajauli - Bakhtiyarpur Expressways Ltd., Completed
       

2.

4-Laning of Barasat-Krishnagar Section of NH-34 from Km.31+000 to Km.115+000 in West Bengal.

Barasat-Krishnagar Expressways Ltd., Completed
       

3.

4-laning of Vijayawada – Machilipatnam Section OF NH-9 from Km.0+000 to Km.63+800 in Andhra Pradesh.

Vijayawada – Machilipatnam Expressways ltd., Completed
       

4.

Feasibility Report for Development of Integrated Transport Hub at Old Gandhi Hospital, Secunderabad -HMR-Corridor II

Hyderabad Metro Rail Ltd., Completed
       

5.

4/6-laning of Jalandhar-Amritsar section of NH-1 from Km.387+100 to Km.407+100 in Punjab.

IVRCL Infrastructures & Projects Ltd., Completed
       

6.

6-lane divided carriageway for Ranchi Ring Road (RRR-1 & RRR-II) in Jharkhand.

GKC Projects Ltd., Completed
       

7.

4/6-laning of Gujarat/Maharashtra Border – Surat – Hazira Port section (NH-6) Km.0+000 to Km.76+000 in Gujarat.

Soma Enterprise Ltd., Completed
       

8.

4-laning of Cuddappah – Kurnool section of NH-18 from Km.167.750 to Km.228.000 in Andhra Pradesh.

KMC Constructions Ltd., Completed
       

9.

6-laning of Panipat - Jalandhar section (Stretch from Km.96.000 to Km.196.000) in Haryana / Punjab.

ISOLUX – SOMA JV Completed
       

10.

6-laning of Panipat - Jalandhar section (Stretch from Km.240.000 to Km.280.000) – Structures only

ISOLUX – SOMA JV Completed
       

11.

8-lane access controlled expressway under Phase-IIA programme of ORR to Hyderabad City (Interchange only)

Maytas Infra Ltd., Completed
       

12.

8-lane access controlled expressway under Phase-IIA programme of ORR to Hyderabad City from Km.95.00 to Km.108.00.

KMC Constructions Ltd., Completed
       

13.

4-laning of Karur-Dindigul section (Km.305.600 to Km.373.600) of NH-7 in Tamil Nadu

TN (DK) Expressways Ltd., Completed
       

14.

4-laning of Trichy-Tanjavur section (Km.80.000 to Km.137.750) of NH-67 in Tamil Nadu

Trichy-Tanjavur Expressways Ltd., Completed
       

15.

4-laning of Laknadon-Seoni section (NH-7) from Km.547.400 to Km.596.750 in Madhya Pradesh.

Malaxmi Highway Pvt. Ltd., Completed
       

16.

4-laning of Bharatpur-Mahua section from Km.63.000 to Km.120.000 in Rajasthan

Madhucon Agra-Jaipur Expressways Ltd,, Completed
       

17.

4-laning of  Hyderabad-Pune section from Km.493.000 to Km.524.000.(Bridges only)  in Telangana.

Progressive Constructions Ltd., Completed
       

18.

4-laning of Dhule-Pimpalgoan section (NH-3) from Km.265.000 to Km.380.00 (Bridges only) in Maharashtra.

IRCON-SOMA TOLLWAY LTD., Completed
       

19.

4-laning of NH-5 from Nellore-Tada (Km.52.800 to Km.122.200) (Bridges only) in Andhra Pradesh

IWM Construction (P) Ltd.,(A Malaysian Company) Completed
       

20.

4-laning of NH-5 from Tuni - Anakapalli (Km.300.00 to Km.358.200) in association with SMEC, Malaysia

UEDIPL-MPL JV Completed
       

21.

4-laning of NH-45 from Tambaram -Tindivanam (Km.28.00 to Km.122.000) in association with SMEC, Malaysia (Bridges only)

UEDIPL-MPL JV Completed
 
 
 

NHAI – DPR Projects

 

S.No.

Project  Title

Client

Status

1.

Feasibility & DPR of 4/6 laning of Km.270.000 to Km.316.700 on NH-47 from Thrissur to Angamali (length : 46 Kms.) in Kerala.

NHAI Completed
       

2.

Feasibility & DPR of 4-laning of Km.120.000 to 232.000 of NH-7 from Tirunvelli to Kanyakumari (length: 112 Kms.) in Tamil Nadu.

NHAI Completed
       

3.

Feasibility & DPR of 4-laning of Km.0.000 to 120.000 of NH-7 from Madurai to Tirunvelli (length: 120 Kms.) in Tamil Nadu

NHAI Completed
 
 
 

Other DPR Projects

 

S.No.

Project  Title

Client

Status

1.

Planning and designing of 4 lane divided carriage way roads including designing of bridge and CD works for IOCL, Eastern Refinary Project, Paradeep.

IOCL, Paradeep Completed
       

2.

Planning, alignment, designing of road for approaches to bridge across river Gowthami (Part of NH-214) (New alignment).

Navayuga Engg. Company, Vizag (R&B, Govt. of A.P.) Completed
       

3.

Alignment, Survey & Preparation of BOQ for Eluru Bye- pass on NH-5

Madhucon Binapuri JV Completed
 
 
 

Proof Checking Works

 

S.No.

Project  Title

Status

1.

Proof checking of designs & drawings for construction of High level Bridge across Campbell canal at Bhavanipuram to connect Ullipalem at Km.22/8 of Machilipatnam – Kammavaricheruvu road via Chinnapuram in Krishna District

Completed
     

2.

Proof checking the designs & Drawings – Construction of Bridge across Salt creek in Km.11/4-6 Tallapalem – Narayana Puram road in Krishna District under NCRMP

Completed
     

3.

8-lane access controlled expressway under Phase-IIA programme of ORR to Hyderabad City from Km.0+000 to Km.23+700.for HMDA, Govt. of A.P.(Structures)

Completed
     

4.

Major Bridge across River Godavari near Rajahmundry (4080m length, 50m spans) for R & B, Govt. of  A.P.

Completed
     

5.

4-laning of Thondapalli to Jadcherla, in AP (NH-7)  from Km.34.140 to Km.80.for NHAI. (Structures only)

Completed
     

6.

Major Bridge across river Godavari at Km.135/2-8 on NH-16 (1200m long) for R & B, Govt. of A.P.

Completed
     

7.

Rural Road Works (775 Kms.) under World Bank Scheme (APERP) in A.P. for Panchayat Raj Engg. Dept., Govt. of  A.P.

Completed
     

8.

Project Management Consultancy (PMC) in Highway Sector

Completed
 
 
 

Bridge Projects

 

S.No.

Project  Title

Client / Agency

Status

1.

Preparation of Detailed Project Report for construction of bridges (1) HLB across Godavari river near Panchgudi (V) of Lokeshwaram Mandal in Adilabad (incl. 20 kms approaches (out of which new is 4 kms), (2) HLB at Km.3/8 to 4/4 across Manjeera river on Annasagar-Pitlam road in Nizamabad district (3) HLB across Majeera river on road from Dharmareddy to Muddapur via Venkampally road PR road in Nizamabad (incl. approaches of 7 kms) in Telangana State (Package-I)

R&B Dept. Govt. of Telangana DPR Submitted
       

2.

Construction of Bridge in Km.5/2 across Gundupalem zinc @ across Gunderu drain in km.6/6 of Machilipatnam- Kammavaricheruvu road via (Chinnapuram) in Krishna Dist.,

R&B Dept. Govt. of A.P. Designs/ drgs submitted
       

3.

Construction of Bridge across Penneru drain at Km.1/8 of extension of approach road from Chinnagollpalem Bridge at Padatadika village connect Pallepalem village at Km.35/8 of NH-216 in Krishna Dist.,

R&B Dept. Govt. of A.P. Designs/ drgs submitted
       

4.

Construction of 2-lane HLB across Mualvagu River near Shabashpally (V), Boinpally (M) at Km.24/4 on Karimnagar- Kamareddy Road in Karimnagar Dist.,

R&B Dept. Govt. of Telangana Designs/ drgs submitted
       

5.

Bridges on NH-31(Rajauli - Bakhyatpur section) -- 33 nos.

Rajauli - Bakhyatpur Ltd., Designs Completed
       

6.

Bridges on NH-9 (Vijayawada - Machilipatnam section) -- 2 Nos.

Vijayawada - Machilipatnam Ltd., Designs Completed
       

7.

Bridges on NH-33 (Ranchi-Rargaon-Jamshedpur section) -- 305 Nos.

Ranchi Expressways Ltd., Designs Completed
       

8.

Bridges on NH-34 (Barasat - Krishnagar section) -- 7 Nos.

Barasat - Krishnagar Ltd., Designs Completed
       

9.

Bridges on NH-18 (Cuddapah-Kurnool section) -- 41 Nos.

KMC Constructions Ltd., Completed
       

10.

Bridges on NH-19 (Chhapra - Hazipur section) -- 25 Nos.

Chhapra-Hazipur  Expressways Ltd., Designs Completed
       

11.

Bridges on NH-6 (Maharashtra/ Gujarat Border-Surat - Hazira Port section) -- 21 Nos.

Soma Enterprise Ltd., Completed
       

12.

Bridges on NH-1 (Panipat-Jalandhar Sectioon) -- 60 Nos

Isolux-Soma JV Completed
       

13.

Bridges on Hyderabad Ring Road (Pedda Amberpet-Bongulur section) - 2 Nos.

KMC Constructions Ltd., Completed
       

14.

Bridges on Ranchi Ring Road (Pkg-1 & 2) -- 12 Nos.

GKC Projects Ltd., Completed
       

15.

Bridges on NH-7 (Karur-Dindigul section) -- 20 Nos.

TN (DK) Expressways Ltd., Completed
       

16.

Bridges on NH-67 (Trichy-Tanjavur section) -- 23 Nos.

Trichy-Tanjavur  Expressways Ltd., Completed
       

17.

Bridges on NH-7 (Laknadon-Seoni section) -- 11 Nos.

Malaxmi Highway Pvt. Ltd., Completed
       

18.

Bridges  on  Hyderabad-Pune  section  from  Km.493.000  to Km.524.000 -- 2 Nos.

Progressive Constructions Ltd., Completed
       

19.

Bridges on NH-3 (Pimpilgoan – Dhule section) - 40 Nos.

IRCON SOMA JV Completed
       

20.

Bridges on SH-27 & SH-14 (Total Bridges – 25 Nos.)

Madhucon Projects Ltd., Completed
       

21.

Bridges on Road from Thrissur to Angmali section of NH-47 – 6 Nos.

National Highway Authority of India Completed
       

22.

Bridges on Road from Nellore-Tada section of NH-5 - 13 Nos.

IWM Construction (P) Ltd., (A Malaysian Company) Completed
       

23.

Bridges on Road from Tuni - Anakapalli section of NH-5 -- 18 Nos.

UEDIPL-MPL JV Completed
       

24.

Bridges on Road from Tambaram to Tindivanam section - 12 Nos.

UEDIPL-MPL JV Completed
       

25.

Bridge across River Gowthami Godavari on R/F. Yanam to Yadurlanka (1.8 Km. long bridge)

Govt. of A.P.thro. M/s.Navayuga Engg. Co., Visakhapatnam. Completed
       

26.

Bridge across River Coringa Near Yanam

Govt. of A.P. thro’ M/s. Navayuga Engg. Co., Vizag Completed
       

27.

Bridge in Simhadri Power Plant (2 Nos)

NTPC, thro. M/s.Navayuga Engg. Co., Visakhapatnam Completed
       

28.

Bridges for Govt. of Tamil Nadu (5 Nos.).

Madhava Hy-Tech/ Tamil Nadu Government. Completed
       

29.

Bridges/Causeways  for  Govt.  of  A.P.  under  World  Bank Scheme- (7 Nos.)

Govt. of A.P., Completed
       

30.

Bridges/Causeways for Govt. of A.P. under NABARD Scheme (8 Nos.)

Govt. of A.P., Completed
       

31.

Bridges/Causeways   for   Govt.   of   A.P.   under    NABARD Scheme- (5 Nos.)

Govt. of A.P., Completed
       

32.

Bridges/Causeways  for  Govt.  of  A.P.  under  World  Bank Scheme- (11 Nos.)

Govt. of A.P., Completed
       

33.

Bridges / Causeways for Irrigation Dept., Govt. of A.P. under World Bank Scheme – (3 Nos.)

Govt. of A.P., Completed
       

34.

Bridges/Causeways  for  Govt.  of  A.P.  under  World  Bank Scheme (APERP)- (20 Nos.)

Govt. of A.P., Completed
 
 
 

Flyover Projects

 

S.No.

Project  Title

Client / Agency

Status

1.

Preparation of Feasibility Report (FR) for construction of Multi-level flyover  at Rasoolpura Junction at Km.40/8-10 on Inner Ring Road In Metro Rail Project Reach

GHMC, Govt. of Telangana Under Prgoress
       

2.

Consultancy Services for preparation of Detailed Project Report for Flyovers at JNTU Jn., Usha Mullapudi Jn.,, Godrej-Y Jn. & Khairatabad Jn.,

R & B Department, NH Circle Completed
       

3.

5 Nos. Flyovers (6-lane) on Gujarat/ Maharashtra Border - Surat - Hazira Port section of NH-6 (Km.0+000 to Km.76+000)

Soma Enterprise Ltd., (for NHAI) Completed
       

4.

1 No. Flyover   (6-lane) on NH-45-B  (at Km.266++520) in Tuticorin City

Madhucon Projects Ltd., (for NHAI) Completed
       

5.

2 Nos. Flyovers (6-lane) on Ranchi Ring Road (Pkg. I & II)

GKC Projects Ltd., Completed
       

6.

3 Nos. Flyovers (8-lane flyovers) on 8-lane Access Controlled Expressway on Hyderabad outer Ring Road Km.12+000 to  Km.23+700  (Patancheru  - Kollur section)

Maytas Infra Ltd., (for HMDA) Completed
       

7.

5 Nos. Flyovers (8-lane flyovers) on 8-lane Access Controlled Expressway on Hyderabad outer Ring Road

KMC Constructions Ltd., (for HMDA) Completed
       

8.

26    Nos.    Flyovers    (6-lane)on    NH-1    (Panipat- Jalandhar section

Isolux-Soma JV Completed
       

9.

ROB-cum-Flyover on main spinal road from Kukatpally to Hitech City

IJM / HUDA Completed
       

10.

Flyover (1 No.) on NH-7 (Karur-Dindigal section)

TN (DK) Expressways Ltd., Completed
       

11.

8 Nos. Flyovers (6-lane) on NH-67 (Tanjavur-Trich section in Tamil Nadu

Trichy-Tanjavur Expressways Ltd., Completed
       

12.

1 No. Flyover (6-lane) on NH-11 (Bharatpur-Mahwa section in Rajasthan (Km.63+000 to Km.120+000)

Madhucon Agra-Jaipur Expressways Ltd., Completed
       

13.

Flyovers-2 Nos. at Urvasi Jn., and Tatichetlapalem Jn. in Visakhapatnam

Visakhapatnam Municipal Corporation Completed
       

14.

ROB on road from Nellore – Tada (NH-5)

IWM Construction (P) Ltd., (A Malaysian Company) Completed
       

15.

8  Nos.  of  Flyovers  on  Road  from  Tambaram  to Tindivanam (Km.28.000 to Km.122.000 of (NH-45)

Madhucon UEDIPL - JV Completed
       

16.

6 Nos. of Flyovers on road from Thrissur to Angamali of NH-47

National Highways Authority of India Completed
       

17.

5  Nos. of Underpasses on road from Nellore to Tada (NH-5)

IWM Construction (P) Ltd., (A Malaysian Company) Completed
       

18.

Flyover at CTO Junction

Hyderabad Urban Development Authority, Govt. of  A.P. thro’ M/s. Madhucon Srirama (JV) Completed
       

19.

Flyover at Airport Junction

Hyderabad Urban Development Authority, Govt. of  A.P. thro’ M/s. Madhucon Srirama (JV) Completed
       

20.

Flyover at Tarnaka Junction

Hyderabad Urban Development Authority, Govt. of  A.P. thro’ M/s. Madhucon Binapuri(JV) Completed
       

21.

Flyover at Chaderghat Junction

Hyderabad Urban Development Authority, Govt. of  A.P. thro’ M/s. Madhucon Binapuri(JV) Completed
       

22.

Flyover at Nalgonda ‘X’ Roads

Hyderabad Urban Development Authority, Govt. of  A.P. thro’ M/s. Madhucon Binapuri(JV) Completed
       

23.

Flyover at Narayanaguda Junction

Hyderabad Urban Development Authority, Govt. of  A.P. thro’ M/s. Madhava Hy-tech Engineers Completed
       

24.

ROB at Sanjeevaiah Park

Hyderabad Urban Development Authority Completed
       

25.

ROB at Hubli – Darwad Bye-pass

Nandi Highway thro’ Kirloskar Consultant Ltd., Completed
 
 
 

Industrial Projects

 

S.No.

Project  Title

Client / Agency

Status

1.

Detail Engineering for Civil Works for  Coal Handling Plant of 2 x 250MW Bina TPS

Tecpro Systems Ltd., Completed
       

2.

Detail Engineering for Civil works for Raw Material Handling Package of Brahmani Industries Ltd., (2.5 MT Integrated Steel Plant ( 1.25MTPY )

ELECON/ Brahmani Industries Ltd., Completed
       

3.

Owner’s   Engineer   Services   for   Non-EPC   works   and Residential Colony of 270MW TPP in Nellore Dist.,

Simahapuri Energy Pvt. Ltd., Completed
       

4.

Miscellaneous  works  of  CHP  of   Maithon  Thermal  Power Project

Tecpro Systems Ltd., Completed
       

5.

Detail Engineering for Civil Works for Coal Handling Plant of Kahalgaon Super Thermal Power Project, Stage-I (4 x 210 MW) in Bihar

ELECON / NTPC Completed
       

6.

Detail Engineering for Civil Works for Coal Handling Plant of 2 x 250MW Coal based Thermal Power Project at Chabra, Rajasthan.

Tecpro / Punjlloyd Completed
       

7.

Detail Engineering for Civil Works for Coal Handling Plant of 2 x 600MW Coal based Thermal Power Project at Hissar, Haryana.

Tecpro / Reliance Completed
       

8.

Detail Engineering for civil works for CHP of 2 x 300 MW DCR Thermal Power Project, Yamunanagar (Haryana)

Reliance / Tecpro / Elecon Completed
       

9.

Detail Engineering for civil works of Material Handling Plant of Jindal Vijaynagar Steel Plant at Toranagallu, Bellary, Karnataka

ELECON / JINDAL Completed
       

10.

Detail Engineering for Coal Handing Plant of Rayalaseema Thermal Power Project Stage-II (2 x210 MW)(APGENCO Ltd.,)

APGENCO / ELECON / ECMM Completed
       

11.

Detail Engineering for civil works for Coal Handling Plant for Paras Thermal Power Station Expansion (1x250MW) at Paras

MSEB / ELECON / ECMM Completed
       

12.

Detail Engineering for civil works for Coal Handling Plant New Parli Thermal Power Plant (1x250MW) at Parli

MSEB / ELECON / ECMM Completed
       

13.

Detail Engineering for civil works for Coal Handling Plant for RTSPS (Raichur) for Karnataka Power Corporation Ltd.,

KSEB / ELECON / ECMM Completed
       

14.

Detail Engineering for civil works for Coal Handling Plant of Maharashtra State Electricity Board at Chandrapur

MSEB / ELECON / ECMM Completed
 
 
 

Residential & Commercial Complexes

 

A. Project Management Consultancy

 

S.No.

Project  Title

Client / Agency

Status

1.

Project Management Consultancy Services along with Quality Control & Quality Assurance for construction of HMR commercial complex at Puthlibowli.

Hyderabad Metro Rail Ltd., Completed
       

2.

Project Management Consultancy Services along with Quality Control & Quality Assurance for construction of School Buildings at Chadarghat

Hyderabad Metro Rail Ltd., Completed
       

3.

Project Management Consultancy Services for Construction of ESIC Dental College and Hospital Buildings at Nacharam, Hyderabad

Uttar Pradesh Rajakeeya Nirman Nigam Ltd., Completed
       

4.

Project Management Consultancy Services for Construction of  Students Village-I at ISB Campus

Indian School of  Business, Hyderabad Completed
       

5.

180 – Bedded Hospital - Burdwan Health City

Bengal-FAITH Health Care Pvt. Ltd. On going
 

B. Structural Design Engg. Consultancy

 

S.No.

Project  Title

Client / Agency

Status

1.

Development of P & C area at Hydernagar for HMRL

Hyderabad Metro Rail Ltd., Completed
       

2.

Shopping Mall/Office/ Hotel (20,00,000 Sq.Ft.)

Surbana International Consultants India (P) Ltd., Completed
       

3.

Swarna Jayanthi Commercial Complex, Hyderabad

Hyderabad Urban Development Authority Completed
       

4.

Minerva Towers at Secunderabad

M/s. Shalivahana Constructions Completed
       

5.

Gowardhan Satsang Hall at Haridwar, U.P.

Premnagar Ashram, Haridwar, U.P. Completed
       

6.

Residential & Office Complex, Vijayawada

National Highways Authority of  India Completed
       

7.

Infotech Building at Jubilee Hills, Hyderabad

Madhucon Infotech Ltd., Completed
       

8.

Commercial Complex at Begumpet, Hyderabad

Madhucon Infotech Ltd., Completed
       

9.

Infrastructure Development works for 2 cities (Nizamabad & Ramagundam)

A.P.U.S.P. (Funded by Govt. of  U.K.) Completed
       

10.

Infrastructure  Development  works  for  3  cities  (Gulbarga, Bidar & Raichur)

Karnataka PWD, Govt. of Karnataka Completed
 
 
 

Irrigation Projects

 

S.No.

Name of the Project

Client

Status

1.

Design & Detail Engg. of Spillway Bridge for Sripada Sagar Yellampally Project

ITD Cementation India Ltd., Completed
       

2.

Indira Sagar LMC project (from Km.111.00 to Km.136.00) in A.P. (Pkg.No.6)

Madhucon Sinohydro Completed
       

3.

SRSP-Flood Flow Canal from Km.103.000 to Km.122.000 in A.P. (Pkg.No.17)

Madhucon Sinohydro Completed
       

4.

Indira Sagar LMC Project from Km.51.600 to  Km.69.145/ Km.70.045 in A.P. (Pkg.No.63

MAYTAS-NCC JV Completed
       

5.

Indira  Sagar  LMC  Project  (Pkg.No.1)  From  Km.0.000 to Km.25.600.

Progressive Constructions Completed
       

6.

Indiara Sagar RMC Project (Pkg.No.2) From Km.14.800 to Km.38.199.

Progressive Constructions Completed
       

7.

SRSP-Flood Flow Canal from Km.70.000 to  Km.86.000 in A.P.(Pkg.No.15)

Simplex-Subhash JV (thro’ GVPR Engnrs. Pvt. Ltd.,) Completed
       

8.

SRSP-Flood Flow Canal  from Km.28.400 to  Km.43.000 in A.P.(Pkg.No.1)

Patel Soma JV (thro’ Surya Constructions) Completed
 
 
 

Pre-bid Engineering Works (Highways)

 
S.No. Name of the Project Client
1.

4-Laning of Rewa-Katni-Jabalpur of NH – 7 (from km 242.600 to km 311.000) in the state of Madhya Pradesh on EPC mode

Madhucon Projects Ltd.,
     
2.

4-laning of Rewa - Maihar Section of NH-7 from Km.242+600 to Km.311+000 in the state of Madhya Pradesh under NHDP-IV on EPC mode.

Madhucon Projects Ltd.,
     
3.

4-laning of Slimanabad - Jabalpur section of NH-7 from Km.397+000 to Km.465+500 in the state of Madhya Pradesh under NHDP-IV on EPC mode.

Madhucon Projects Ltd.,
     
4.

4-laning of Jabalpur-Lakhnadone section of NH-7 from Km.465+000 to Km.546+600 in the state of Madhya Pradesh on EPC mode

Madhucon Projects Ltd.,
     
5.

4-laning of Yadagiri - Warangal section from Km.54.000 to Km.150.000 section of NH 202 (Nee NH No.163) in the State of Telangana on EPC mode

Madhucon Projects Ltd.,
     
6.

2-laning with paved shoulders of Chas-Ramgarh section of NH-23 from km.0.000 to km.78.192 in the State of Jharkhand under NHDP Phase-IV on EPC mode

Madhucon Projects Ltd.,
     
7.

4- Laning of Madurai- Ramanathapuram section of NH-49 in the State of Tamil Nadu on EPC mode under NHDP-III

Madhucon Projects Ltd.,
     
8.

Development of Agra - Lucknow Acess Controlled Expressway (Green field) Project from Bilgram to Lucknow section Km:236+500 to 299+500 in the state of Uttar Pradesh on EPC mode (Pkg-5)

Madhucon Projects Ltd.,
     
9.

Development of Agra - Lucknow 6-Lane Access Controlled Expressway (Green field) Project from Chhibramau to Talgram Road section (CH. 115+500 to 172+500) in the state of Uttar Pradesh on EPC mode (Pkg-3)

Madhucon Projects Ltd.,
     
10.

Development of Agra - Lucknow Acess Controlled Expressway (Green field) Project from Agra to Firozabad (village Gurha) section Km.2+634 to 53+500 in the state of Uttar Pradesh on EPC mode (Pkg-1)

Madhucon Projects Ltd.,
     
11.

Improvement from km. 0.0 to 68.000 (Knakatora – Jharsuguda section ) upto two lane with paved shoulder including bypass at Belpahar 52nd Km. of NH-200 (from Km.197.000 to Km.265.300 including bypass at Belpahar 249th Km. of NH-49) - on EPC mode

Madhucon Projects Ltd.,
     
12.

Rehabilitation and upgradation of existing NH-565 from Km 425/400 to Km 509/400 (Penchalakona to Yerpedu section) to two lane with paved shoulder in the State of Andhra Pradesh under NHDP –IV -EPC mode

Madhucon Projects Ltd.,
     
13.

Rehabilitation  and  Upgradation  of  Nakrekal  to  Nagarjunasagar  section  of   NH-565 from Km 1.000 to Km 86.057 in the state of Telangana on EPC mode.

Madhucon Projects Ltd.,
     
14.

Rehabilitation   and    Upgradation   of   NH-765   from   Km   23.000   to   Km   108.800 (Hyderabad to Dindi section) in the state of Telangana  on EPC mode.

Madhucon Projects Ltd.,
     
15.

6-laning of Barwa-Adda-Panagarh section of NH-2 from Km.398.240 to Km.521.120 including Panagarh bypass in the states of  Jharkahand and West Bengal.

IVRCL Assets & Holdings Ltd.,
     
16.

4-laning of Kuttipuram-Edapally section of NH-17 from Km.318+000 to Km.438+000 in Kerala

Soma Enterprise Ltd.,
     
17.

6-lning of Tumkur-Chitradurga section (excluding Tumkur & Chitradurga Bypass) from Km.75.000 to Km.189.000 of  NH-4 (Approx 114.00 Kms.) in the state of Karnataka

Madhucon Projects Ltd.,
     
18.

Upgradation   of   Hyderabad-Bangalore   section   of   NH-7   from   Km.534.720   to Km.556.840 in the State of Karnataka

Soma Enterprise Ltd.,
     
19.

4 Packages of State Highway Projects (2/4-laning) in Gujarat State

Madhucon Projects Ltd.,
     
20.

4-laning of Hongud – Hospet section of NH-13 from Km.202.000 to Km.299.000 in the state of Karnataka  under NHDP Phase-III on DBFOT basis.

Patel – KNR (JV)
     
21.

6-Laning of Krishnagiri– Walahjipet section of NH-4 & 46

Isolux – Soma-Omaxe Consortium
     
22.

4-Laning of Hyderabad – Yadagiri section of NH-202 from Km.18.600 to Km.54,000 on DBFOT Toll Basis (Pkg. No.DP-III/BOT/Andhra Pradesh/04)

KMC Constructions Ltd.,
     
23.

Chennai Outer Ring Road (Total Length:29.557 Km.)

Soma Enterprise Ltd.,
     
24.

2-laning of Radhanpur-Mehsana Harij - Patan (total length = 121.500 kms.)

Madhucon Projects Ltd.,
     
25.

2-laning of Netrang - Halol section (total length = 141.700 kms.)

Madhucon Projects Ltd.,
     
26.

2-laning of Vapi - Netrang section (total length = 190.000 kms)

Madhucon Projects Ltd.,
     
27.

6-Laning  of  Vijayawada–Eluru-Rajahmundry  section  of  NH-5  (Total  Length:198.2 Kms)

Isolux – Soma Consortium
     
28.

6-Laning of Indore – Dewas Section of NH-3 (Total Length 45.05 Kms)

Isolux – Soma Consortium
     
29.

6-Laning of Chilkaluripet – Nellore Section of NH-5  (Total Length 183.700 Kms)

Isolux – Soma Consortium
     
30.

4-laning of Armur - Adloor Yellareddy section from Km.308.000 to 367.000 of NH-7.

Madhucon Projects Ltd.,
     
31.

4/6 laning of Eastern Peripheral Expressway (NE-II)

IL & FS Transportation Networks Ltd.,
     
32.

4/6 laning of Hyderabad-Vijayawada section (NH-9) from Km.40.000 to Km.221,000

Isolux – Soma-Omaxe Consortium
     
33.

6-laning of Chilakaluripet-Vijayawada section (NH-5) from Km.355.000 to oKm.434.150

KMC Constructions Ltd.,
     
34.

6-laning of Chennai-Tada section (NH-5) from Km.11.000 to Km.54.400.

Madhucon Projects Ltd.,
     
35.

6-laning of Panipat-Jalandhar section (NH-1) from Km.96.000 to Km.196.000

ISOLUX – SOMA JV
     
36.

6-laning of Gurgoan-Kotputli- Jaipur section  (NH-8) from Km.42.700 to Km.273.000

Soma Enterprise Ltd.,
     
37.

4-laning of Bhopal - Dewas section (SH-18) -- total 145 kms.

Soma Enterprise Ltd.,
     
38.

4-laning of AP-Karnataka Border to Avanthi Village (NH-7) from Km.463.600 to Km.524.000   (Pkg.No.NS2/BOT/KNT-1)

BCEOM India Pvt.Ltd.,
     
39.

4-laning   of   Thanjavur   to   Trichy   (NH-67)   from    Km.80.000   to   Km.135.750 (Pkg.No.NHDP-III/BOT/TN/03)

BCEOM India Pvt.Ltd.,
     
40.

4-laning   of   Salem   to   Chinna   Salem   (NH-68)   from   Km.0.313   to   Km.88.000 (Pkg.No.NHDP-III/BOT/TN/06)

BCEOM India Pvt.Ltd.,
     
41.

4-laning of NH-7 on start of Agra to end of Agra bypass from Km.176.800 of NH-2 to Km.13.030 of NH-3.

BCEOM India Pvt.Ltd.,
     
42.

4-laning  of  NH-7  Gwalior  bypass  from  Km.0.000  to  Km.43.000  connecting  at Km.103.000 of NH-3 and Km.16.000 of NH-75

BCEOM India Pvt.Ltd.,
     
43.

4-laning of Padalur-Trichy section (NH-45) from Km.285.00 to Km.325.00

Madhucon Projects Ltd.,
     
44.

4-laning of Karurur – Dindigul section Km.292.600 to Km.373.725 on NH-7

Madhucon Projects Ltd.,
     
45.

4-laning  of  Laknadon-MP/MH  Border  section  from  Km.547/400  to  Km.596/750  – (MP2 package)

Mahalaxmi NBFA Ventures Private Ltd
     
46.

Chattisgarh / Maharastra Border – Waingana Bridge (Km.405.00 to Km.485.00 of NH 6)

Soma Enterprise Ltd.,
     
47.

4-laning of from End of Durg Bypass – Chattisgarh/ Maharastra Border (Km.322.4 – Km.405.00 of NH-6)

Soma Enterprise Ltd.,
     
48.

Access Controlled Highway Project of Bangalore Nelamangala Section of NH-4 from Km.10.000 to Km.29.500

Soma Enterprise Ltd.,
     
49.

4-laning of  NH-7 from Km.230/000 (Islamnagar) to Km.278.00 (Kadthal)

Madhucon Projects Ltd.,
     
50.

4-laning of NH-7 from Km.308.000 to Km.367.000 (Armur-Adloor Yellareddy section in Andhra Pradesh (Pkg no.NS2/BOT/AP-1)

Madhucon Projects Ltd.,
     
51.

4-laning of NH-7 from Km.367.000 (Adloor Yellareddy to Km.447.000 (Kalkallu) and Km.447.000 (Kalkallu) to Km.464.000 (Gunla Pochampalli) (Pkg.No.NS2/BOT/AP-2)

Madhucon Projects Ltd.,
     
52.

4-laning of NH-7 from Km.34.100 (Farukhnagar) to Km.80.000 (Jedcherla) and Km.22.300 (Thondapalli) to Km.34.100 (Farukhnagar) in Andhra Pradesh (Pkg. No.NS2/BOT/AP-3)

Madhucon Projects Ltd.,
     
53.

4-laning of NH-7 from Km.80.000 (Jadcherla) to Km.135.740 (end of prooposed Kotakatta bypass) (Pkg.No.NS2/BOT/AP-4) in Andhra Pradesh

Madhucon Projects Ltd.,
     
54.

4-laning of NH-7 from Km.135.740 (end of prooposed Kotakatta bypass)  to Km.211.000 (Kurnool) in Andhra Pradesh (Pkg.No.NS2/BOT/AP-5)

Madhucon Projects Ltd.,
     
55.

4-laning of NH-7 from Km.643.600 (AP/Karnataka border) to Km.524.000 (Avathi Village) and Km.524.000 (Avathi Village) to Km.527.000 (Nandi Hills and Km.535.000 (Devanhalli Village) to Km.539.000 (Meenukunte village) in Karnataka (Pkg. No.NS2/BOT/KNA-1)

Madhucon Projects Ltd.,
     
56.

4-laning of NH-7 from Km.94.000 (end proposed Krishnagiri flyover) to Km.156.000 (Thumpipadi) and Km.156.000 (Thumpipadi) to Km.163.400 (Thopurghat) in Tamil Nadu  (Pkg.No.NS2/BOT/TN-1)

Madhucon Projects Ltd.,
     
57.

4-laning of NH-7 from Km.207.050 (Salem) to Km.248.625 (start proposed flyover on Namakkal bypass) and Km.199.200 (start of Salem bypass on NH-7) to Km.207.050 (Salem) in Tamil Nadu (Pkg.No.NS2/BOT/TN-2)

Madhucon Projects Ltd.,
     
58.

4-laning of NH-7 from km.258.645 (end of Namakkal bypass) to Km.292.400 (start of Karur bypass) and Km.248.625 (start of proposed flyover on Namakkal bypass) to Km.258.645 (end of Namakkal bypass) in Tamil Nadu (pkg.no.NS2/BOT/TN-3)

Madhucon Projects Ltd.,
     
59.

4-laning of NH-7 from km.258.645 (end of Namakkal bypass) to Km.292.400 (start of Karur bypass) and Km.248.625 (start of proposed flyover on Namakkal bypass) to Km.258.645 (end of Namakkal bypass) in Tamil Nadu  (pkg.no.NS2/BOT/TN-3)

Madhucon Projects Ltd.,
     
60.

4-laning of NH-7 from Km.373.725 (start of proposed Dindigual bypass) to km.426.600 (Samyanallore) in Tamil Nadu (Pkg. No.NS2/BOT/TN-5)

Madhucon Projects Ltd.,
     
61.

4-laning of NH-7 from Km.0.000 (Salem) to Km.53.52 (Kumarpalayam) in Tamil Nadu (Pkg.  No.NS2/BOT/TN-6)

Madhucon Projects Ltd.,
     
62.

4-laning of NH-7 from Km.53.520 (Kumarapalayam) to Km.100.000 (after Chengapally) in Tamil Nadu  (Pkg. No.NS2/BOT/TN-7)

Madhucon Projects Ltd.,
     
63.

Panipat Elevated Corridor

Soma Enterprise Ltd.,
     
64.

4-laning of Kopergoan - ahmednagar Road SH-10 from km.78.200 to Km.120.00 and construction of 2-lane Shirdi-Rahata Byepass(Section-1)

Madhucon Projects Ltd.,
     
65.

4-laning of Kopergoan - ahmednagar Road SH-10 from km.120.000 to Km.175.530 (Section-2)

Madhucon Projects Ltd.,
     
66.

Pre-bid Consultancy services for 4/6 laning of the existing 2 lane section from Mohagaon to Khawasa upto MP/Mh border (Km 624+480 2km 653+225) of NH-7 in the State of Madhya Pradesh on EPC mode

L&T Ltd.
 
 
 

Pre-bid Engineering Works (Industrial Projects)

 
S.No. Project Title Client
1.

Civil & Structural Works for Coal Handling Plant of  Vindyachal Super Thermal Power Project.

Nagarjuna Construction Company Ltd.,
     
2.

Civil  &  Structural  Works  for  Coal  Handling  Plant  of   Malwa Thermal Power Project (2 x 600 MW)

Tata Projects Ltd.,
     
3.

Civil works for Raw Material Handling system – Bokaro Steel Plant

Prasad & Company (Project works) Ltd.,
     
4.

Raghunathpur Thermal Power Project – Damodar Valley Corporation

Prasad & Company (Project works) Ltd.,
     
5.

Bongaigoan Super Thermal Power Project (3 x 250 MW) – Civil & structural works in Assam

Prasad & Company (Project works) Ltd.,
     
6.

Aravali Super Thermal Project, Jhajjar (3x500 MW) – Coal Handling Plant Package

Elecon Engg. Company Ltd.,
     
7.

Damoder Valley Corporation – Koderam Thermal Power Project

Elecon Engg. Company Ltd.,
     
8.

Dadri National Thermal Power Project, Dadri

Elecon Engg. Company Ltd.,
     
9.

Khaperkheda Coal Handling system, Khaperkheda

Elecon Engg. Company Ltd.,
     
10.

Harduaganj Thermal Power Project (2 x 250 MW) – Coal Handling Plant Package

Elecon Engg. Company Ltd.,
     
11.

Jindal Steel works, Bellary

Elecon Engg. Company Ltd.,
     
12.

Mejia TPS Phase-II Unit 1 & 2 (2 x 500 MW) , Damodar Valley Corporation

Elecon Engg. Company Ltd.,
     
13.

400 MW Ultra Power Project at Mundra, Coastal Gujarath Power Ltd.,

Elecon Engg. Company Ltd.,
     
14.

Pakri Banwadih Coal Mining Project

Elecon Engg. Company Ltd.,
     
15.

Raichur Thermal Power project, Raichur - Karnataka Power Generation Co. Ltd.,

Elecon Engg. Company Ltd.,
     
16.

Simhadri Super Thermal Power Project - NTPC

Elecon Engg. Company Ltd.,
 
 
 
 

HOME

 

ABOUT US

 

Our Mission

 

Our Vision

 

Our Values

 

OUR PROJECTS

 

OUR CLIENTS

 

Achievements

 

CAREER

 

CONTACT

 

ENQUIRY

MELTECH INFRASTRUCTURE ENGINEERS LIMITED

Registered Office

6-3-866/2, 4th floor, Greenlands, Begumpet, Hyderabad - 500 016.

Phone: 040-2341 7631,
Fax: 040-23417632,

E-mail ID: info@meltechinfra.in

 

Hyderabad SBU

Sai Krupa Arcade, Behind Jubile Ridge Hotel, Kavuri Hills Phase 1
Kavuri Hills, Madhapur, Hyderabad, Telangana-500 033.

Phone: +91 85278 00016,

E-mail ID: duttapintu72@gmail.com

Web Address: www.meltechinfra.com
 

Kolkata SBU

P-486B, Keyatala Road, Ground Floor,
Kolkata : 700 029.

Phone: 033 4602 2849

 

Contact Persons

CORPORATE OFFICE:

MR. SAMIRAN SEN (Director & CEO)

E-mail ID: samiran.meltech@gmail.com

 
HYDERABAD SBU:

MR. PINTU DUTTA (SBU Head)

E-mail ID: duttapintu72@gmail.com

 
KOLKATA SBU:

MR. TAPAS MUKHERJEE (Head - Business Development)

E-mail ID: tapasmukherjee.meltech@gmail.com

 

Site Powered By:
www.calcuttayellowpages.com

 
Meltech Infrastructure Engineers Limited