 |
Multi Service
Govt. Contractor & General Supplier |
|
Specialist in All Type of Civil, Mechanical (Boiler & Turbine Auxiliaries), Erection & Maintenance Electrical, Insulation, Refractory and AC works etc. |
|
HEAD OFFICE ADDRESS -
Anandam APARTMENT’
GROUND FLOOR, 6 Abdul Halim Lane,
KOLKATA – 700 016, WEST BENGAL . India |
|
Our Branch Offices in Sagardighi (West Bengal) & Bakreswar (West Bengal) |
|
|
|
|
 |
OUR GOALS |
Our goal is to extend the life of your plant components. ‘Repair rather than replace’ enables you to avoid the unnecessary re-manufacturing and replacement of equipment |
|
 |
Our strong points |
1) Having ultra modern workshop at Howrah.
2) Wide network with good logistic facilities.
3) Associated with renowned Architects, Structural engineers, Consultants to solve critical problems. |
|
 |
Our values |
We committed to quality services at competitive rates & attractive delivery schedules maintaining safety and environmental policies. We respond to customer promptly in a friendly way offering the best possible quality & service. |
|
|
WHAT WE DO |
» Mechanical Division
Boiler & Turbine Auxiliaries
Cooling Tower
BFP Pump
ACW Pump & CCW Pump
Valves (Safety, Gate, Globe, NRV, MOV, Control)
Online Leak Sealing |
|
|
» Misc. Jobs
Refractory
Insulation
Painting of Machineries
AC Works |
|
|
|
|
OUR VALUABLE
CLIENTS
|
|
|
|
We are also obey the Safety Rules
✓ High-risk situations
Do not start up or shut down equipment or installations without using the appropriate written operating procedure.
✓ Protective equipment
Do not access installations and perform work without wearing general or task-specific personal protective equipment (PPE).
✓ Body mechanics and tools
Do not carry out work if you do not have the right tools for the job and the environment.
READ MORE
|
|
|
|